My new V&H big shot longs,PCIII, and my Ness super sucker where on my door today when I got off work

I put my exhaust on first since I figured this would be the hardest part. This was alot easier then I though it would be. The part that took the longest on this step of the job was running to the store to by a new 45 hex wrench since mine was stripped out. In total this part took about 2.5 hours.
Second step was the Super sucker. This was a pcs of cake.... took about 20-30 minutes
Third was the PCIII, This took me a little longer then it should of but was still very easy..... took about 30-45 minutes.
To sum it up... If anyone out there is thinking about doing this upgrade themselves....I would say go for it. It took about 3.5-4 hours and was well worth the money. My Bike used to sound like a mo-ped.... It now sounds like a Harley
Just want to thank Painter,afnurse and everyone else that help helped me get this step out of the way.
Ill post a pic if I ever figure out how to do it.